Some Knowledge About PVC Pipes, +1 For Collection!

Sep 21, 2024
Introduction to the sanitary performance indicators of PVC pipes

 

There are two important indicators of PVC pipes that affect the hygienic performance of products: one is the content of VCM monomers, and the other is the content of heavy metal precipitation. The key points are as follows:

 

1. VCM refers to polyvinyl chloride monomers, which are slightly soluble in water, soluble in ethanol and ether. If VCM is dissolved in water and exceeds the standard, it will affect the human nervous system and liver function, so the country has strict requirements for this indicator. The national standard stipulates that the VCM content is ≤1mg/kg. The PVC pipe and fittings products produced by Huaya Dongya Plastic Co., Ltd. can reach <0.5mg/kg, which fully meets the national standard requirements for VCM indicators, and some indicators even exceed the national standard requirements.

 

2. Heavy metal content: The main influence in PVC pipes is the metal content of lead, cadmium, mercury, etc. If the above heavy metals exceed the standard, it will cause headaches to the human body and even affect the digestive and urinary systems. The test results of PVC pipes and fittings produced by Huaya Dongying Plastic Co., Ltd. are: lead <0.0025mg/L, cadmium <0.0005mg/L, mercury <0.0001mg/L, which fully meet the national standard requirements for heavy metal content, and some indicators even exceed the national standard requirements. The details are as follows:

 

Project Technical indicators Test results

Lead,

Cadmium and mercury dissolution test

Lead

≦0.005mg/L

<0.0025mg/L

Cadmium

≦0.001mg/L

<0.0005mg/L

Mercury

≦0.001mg/L

<0.0001mg/L

 

Analysis of the causes of rupture of PVC pipes during water and pressure testing

 

PVC water supply pipes are mostly used in pressure pipe systems. After each project is completed and installed, water and pressure tests need to be carried out in a timely manner as an important basis for completion acceptance. If the pipes and accessories selected by the user are of high quality and qualified, meet the requirements of relevant standards, the pressure level and caliber are selected correctly, and the construction, installation and pressure test operations are standardized, the project will progress smoothly and will not easily break. However, if the selected product itself has quality problems, or the installation and pressure test links are not standardized, it is easy for the pipe to break, which will cause trouble for the smooth delivery of the project. Therefore, when we are doing pipeline projects, it is very important to choose high-quality products that meet national standards and standardized construction, which is the key to the success of the entire project.

 

In addition to the above factors, improper operation during the final pressure test will also cause damage to the pipeline and cause rupture. Combined with the experience summarized over the years, the following are the reasons why PVC pipes may break during water and pressure testing:

 

1. The impact of air hammers:

Air hammers can cause pipe bursts because the rapid opening and closing of valves or the start and stop of water pumps causes a large pressure increase in the pipeline. Due to the compressible characteristics of gas, and the fact that the exhaust valve is not installed at the outlet, highest point, or inlet according to the specifications, the stress is concentrated, causing the gas to generate high pressure and burst the pipe. Here we also remind everyone to avoid using gas as a medium for pressure testing of PVC pipes. (Create a link)

 

2. The impact of scratches:

If PVC pipes are not properly protected during handling, loading and unloading, transportation, and sleeve installation, scratches, bumps, and other damage will be caused to the surface of the pipe. According to the crack theory of brittle failure, these scratches will cause stress to be concentrated at the tip of the scratch, and the stress here is much higher than the average stress of the pipe. When this stress reaches and exceeds a certain critical value, the crack will rapidly expand, causing brittle failure.

 

3. Impact of water hammer:

Water hammer refers to the process of transient pressure change, which is a special fluctuation phenomenon caused by the unstable flow of fluid in the pipeline. When the flow rate in the pipeline changes suddenly due to some reason, such as opening and closing the valve too quickly, or suddenly stopping the power supply and stopping the pump, it will cause a sudden change in the pressure in the pipe, causing water hammer. Water hammer is also called water hammer. The physical reason for the water hammer phenomenon is mainly due to the inertia and compressibility of the liquid. When the water hammer pressure is large enough, it will cause brittle failure of PVC pipes. Even if the pipe is not damaged immediately, when the water hammer occurs repeatedly, especially at a high frequency, fatigue load is applied to the pipe, which will also reduce the safety factor of the pipe.

 

4. Impact of rough operations such as throwing and dropping:

When storing, transporting, and installing PVC pipes, rough operations such as throwing and dropping the pipes will also cause small cracks or defects in the pipes. According to the crack theory of brittle failure, stress concentration is very likely to occur here, resulting in brittle failure of the pipes.

Based on the above analysis: When testing water and pressure of PVC pipes, special attention should be paid to the above factors to avoid the occurrence of these phenomena, strictly follow the specifications and ensure the smooth delivery of the project.

 

Introduction to the service life of PVC exposed pipes

 

1. All substances will be aged to varying degrees when exposed to sunlight, and plastic products are no exception. Generally, PVC pipes should be buried underground as much as possible, and building drainage pipes should also be designed indoors for this reason. In addition to PVC powder and calcium carbonate, the composition of PVC pipes also needs to add stabilizers, lubricants and colorants. If there are special physical property requirements, modifiers can also be added as appropriate. The role of stabilizers is closely related to the service life of pipes. Since PVC resin is unstable to heat and light, when it is continuously heated at 70-130℃, hydrochloric acid (HCL) will precipitate, and it will turn from slightly yellow to brown. At the same time, it will accelerate its decomposition reaction rate, causing its physical properties to deteriorate and making it difficult to process. In addition, long-term erosion of PVC pipes by ultraviolet rays from sunlight will promote the deterioration (aging) of the physical properties of PVC pipes. In order to improve the thermal stability of PVC pipes and prevent the deterioration of physical properties caused by long-term exposure to sunlight, stabilizers must be added. Due to different formulations, the aging resistance rate and service life of PVC pipes will also vary. If the calcium carbonate content is a little higher, the modifier is a little higher, and the choice of stabilizer is a little worse, it will be exposed to sunlight for a long time and accelerate its aging speed, affecting its service life.

 

2. PVC pipes are buried underground. Because they will not corrode, rust or rot, the service life of PVC pipes is internationally recognized to be more than 50 years. In fact, it can still exceed this period by a lot, and it can be called a semi-permanent pipe.

 

3. In the case of exposed piping, due to the difference in temperature in different places, the difference in the intensity of sunlight and the difference in exposure to sunlight, its service life will vary. In general, the life of exposed piping should be confirmed to be 10~15 years. (Except for abnormal use)

 

4. The service life of exposed piping is shorter than that of buried pipes. The main reason is that the exposed piping is eroded by ultraviolet rays from the sun for a long time, resulting in physical deterioration, that is, aging. Therefore, exposed piping should be replaced after 10~15 years of use (for pressure pipes). The life of non-pressure pipelines will be further extended.

 

5. The service life of exposed pipes generally varies due to the different temperatures in tropical and cold regions and the different wall thickness of the pipes. If exposed pipes are required in cold regions, the surface of PVC pipes must be covered with asbestos cloth (asbestos rope), glass fiber felt, polystyrene (PS foam) and other insulation materials to prevent ice from forming inside the pipes and to maintain the smooth flow of liquid inside the pipes.

 

PVC pipeline overhead installation support distance description

 

The most critical part of PVC pipeline overhead installation is how to fix the pipeline. During the pipeline fixing process, the rationality of the support installation distance becomes the key to whether the overhead pipeline can operate safely in the long term. After years of construction experience, combined with the PVC pipe construction specifications, the recommended PVC pipeline support distance is as follows:

 

Nominal outer diameter Riser support distance Cross pipe support distance
Φ40 or less

1.5m

1.0m

Φ50-Φ75

2.0m

1.5m

Φ75 or above

2.5m

2.0m

 

Several common emergency repair methods and precautions for PVC pipes

 

1. Treatment methods for damaged pipes

If there is a slight leak at the pipe connection or the pipe itself has a slight crack, it is usually repaired by "patching" or "sticking".

 

1. Sticking: Cut a section of pipe of the same specification and cut it from the middle. Apply adhesive to the inner surface of the cut test piece and wipe the outer wall of the leaking part of the pipeline clean. Apply pressure to the cut pipe test piece and stick it to the leaking part.

 

2. Patching: "Packing" means using PVC plastic welding rods to weld and repair. The welding part must be kept dry during welding, and the ambient temperature must not be lower than 5℃.

 

Precautions:

(1) The emergency repair method for leaks must drain the water as much as possible, wipe it clean, and scrape the surface of the leaking part with a knife to facilitate welding.

(2) The working pressure of the leaking pipeline should generally not exceed 0.4MPa, and a lower pressure is preferred.

 

2.Emergency repair of straight pipelines

 

(1) If there is no expansion joint near the leak, the leaking part of the pipeline should be sawed off, and a short pipe with a loop should be added and then connected with a flange. The other end of the pipeline should be glued to the flange and the adhesive should be completely dried before the flange is locked.

 

(2) If there is an expansion joint near the leak, the leaking part should be sawed off, and a sleeve and a short pipe should be added to one end and then connected with the flange. The other end should be directly glued to the flange and the flange should be locked after the adhesive is dried.

 

2. When there is water in the pipeline that cannot be drained, the following methods should be used:

The leaking pipe section should be sawed off, and the two ends of the pipe should be connected with a short pipe with a loop and then a flange, and finally the flange should be locked.

 

3. Emergency repair of elbows

 

1. When the water in the pipeline can be drained, the following solution is adopted:

Add a sleeve to one end of the pipeline and connect a short pipe to the elbow, directly connect the other end of the elbow to a short pipe and flange, connect the other end of the pipeline to the flange, and finally lock the flange.

 

2. When the water in the pipeline cannot be drained, the solution is as follows:

Connect the flanges at both ends of the elbow through a short pipe, add a loose short pipe at both ends of the pipeline and then connect the flange, and finally lock it with the flange at the elbow.

 

4. Emergency repair of tee

 

1. When the water in the pipeline can be drained, the following solution is adopted:

After sawing off the leaking tee, add a sleeve to the straight pipe end and connect it to the tee, add a slip-on head and a flange short pipe to the tee branch pipe and the other straight pipe end (the pipeline connected to it is also bonded with flanges respectively), and finally tighten the flange.

 

2. When the water in the pipeline cannot be drained: the three sections of the pipeline are connected with slip-ons and flange short pipes respectively, and the three ends of the tee are connected with the flange short pipe, and finally the flange screws are tightened.

 

5. Emergency repair of flange leakage

 

Generally, saw off the flange, add a short sleeve to connect it to the flange, and finally lock the flange.

1. Flange removal method: If the distance is short and the sleeve cannot be added, the flange can be sawed crisscrossed by hand. After sawing the flange, remove the flange with a chisel and then glue it.

 

2. Internal plugging and gluing method: Generally, there are valves on the flange part. When the flange leakage is not serious, the valve can be removed and the saw blade or other tools can be used to dip the adhesive and pour it into the gap from the inside of the flange.

 

6. Explanation of common problems during construction

 

1. TS bonding does not require chamfering.

2. Insufficient or uneven amount of glue applied.

3. Insufficient pressure, pipeline backfilling and fixing, pipeline subjected to external force.

4. TS bonding is not cleaned or the adhesive is not completely dry after bonding, and the pipeline is moved, causing the interface to loosen.

5. Insufficient soil retaining measures, foreign objects fall into the trench and damage the pipeline.

6. Barbaric construction, throwing and dropping of pipes.

7. For the bonded flange, tighten the screws before the adhesive is dry, which loosens the bonding mouth.

8. The rubber ring is turned upside down or the rubber ring is placed upside down, etc.